(505) 242-4848
Wet well with valve vault

Wet well with valve vault

Owner: City of Farmington
Engineer: HDR Engineering, Inc.
Location of Project: Farmington, NM
Final Contract Amounts / Completion Dates
Lift Station No. 2:
$1,385,518 / September 2015
Lift Station Nos. 3, 5, and 22:
$1,099,740 / November 2015

These projects provided improvements to existing lift stations with the complete rehabilitation of existing wet wells and valve vaults including new piping, pumps, process controls, and structural concrete. During construction, each lift station was taken off-line and sewage was by-passed for approximately three months.

Motor Control Center with conduit to wet well

Motor Control Center with conduit to wet well