Project Name: Sunport Extension Project
Completion Date: June 2, 2023
Construction Cost: $21,128,265.92
Construction Start Date: Sept. 27, 2021
Project Duration: 20 months
Construction Notifications: The Sunport Blvd. extension project has been open to the public since June 2, 2023.
The purpose of this project is to connect Broadway Blvd. and I-25 at the existing Sunport Blvd. Interchange and close this gap in the area’s transportation network, adding an additional access route to The Albuquerque International Sunport.
The Project consists of new roadway extending Sunport Boulevard from I-25 to Broadway Boulevard and which includes subgrade preparation, borrow, basecourse, asphalt concrete paving, Portland Cement concrete pavement, bridges, retaining walls, curb and gutter, concrete wall barrier, metal barrier, drainage improvements, signing, stripping, signals, lighting, MSE wall repair at I-25, and intersection and approach improvements at the existing Broadway and Woodward Intersection.