Combat Aviation Brigade (CAB) Water and Sewer Infrastructure Phases I & II
Owner: Army Corps of Engineers Engineer: Brown & Caldwell Location of Project: Fort Bliss, Texas Contract Amount: $8,511,910 AUI built and maintained a solid relationship with Brown and Caldwell, Fort Bliss Water Services, Co. and the Army Corps. of Engineers...
Spaceport America – SP-004 Waste Site Utilities & Wastewater Treatment Plant
Owner: New Mexico Spaceport Authority Engineer: AECOM Prime Contractor: Gerald Martin Construction Location of Project: Upham, NM Contract Amount: $2,170,176.00 AUI worked diligently with Gerald Martin Management to maintain open communication and flexibility, as this...
Taos Valley Regional Wastewater Treatment Facility
MBR Upgrade Owner: Town of Taos Engineer: Souder Miller & Associates Location of Project: Taos, NM Contract Amount: $5,945,485 This project involved civil mechanical, electrical and structural components to convert and expand the existing City of Taos water...
TA-1 Waterline Rehabilitation
Improvements to the water distribution system in Technical Area 1 on Sandia National Laboratories (SNL) utilizing trenchless technology to replace deteriorated portions of the waterline throughout the tech area. A total of 4,450 LF of 6” to 12” waterline was replaced during this project; approximately 66% through pipe bursting and 34% through open-cut-and-replace.
There were approximately 700 potholes through the duration of this project. At one intersection alone, there were 21 undocumented utilities. Upon locating these utilities, AUI would coordinate with SNL representatives to get a GPS reading on the utility line, determine if the line was active or inactive, and add the line to the as-built documents for this project. Each situation concerning an unknown underground facility presented unique challenges including the need for penetration permits, and modification to the proposed waterline installation plan to avoid conflicts with these facilities.
Angel Fire PID 2007- Roadway and Infrastructure Improvements
Angel Fire PID (Owner) Location of Project: Angel Fire, NM Contract Amount: $24,541,188.31 AUI’s work in Angel Fire, NM on the Angel Fire PID 2007 - Roadway and Infrastructure Improvements Project was a Design-Build Project. The overall scope of this design/build...
Paseo Del Volcan (Northern Section) Stage II, IRIS to US 550
City of Rio Rancho Location of Project: Rio Rancho, NM Contract Amount: $8,796,959 (AUI Inc.'s subcontract amount) The project called for a 3.1 mile extension of Paseo del Volcan from Iris Road to US 550 consisting of the addition of a two-lane roadway, drainage...
I-10, Las Cruces to Texas State Line
New Mexico Department of Transportation (Owner) Location of Project: Dona Ana County, NM Contract Amount: $5,092,543.51 (AUI Subcontracted portion) AUI was subcontracted by Mountain States Constructors, Inc. to assist in the new construction and rehabilitation of I-10...
Site Development Services
AUI Inc. (AUI) is a 100% New Mexico owned and operated corporation with over 30 years of experience in Heavy Highway Utility Construction Contracting. Founded in 1981, AUI has evolved with the times and the industry to become a multi-disciplined and diversified...