Bridges
Our bridge-related services include bridge rehabilitation, and construction of new bridges with concrete or steel girders, cast-in-place bridge members, and post-tensioned bridges structures.
Sunport Extension Project
The purpose of this project is to connect Broadway Blvd. and I-25 at the existing Sunport Blvd. Interchange and close this gap in the area’s transportation network, adding an additional access route to The Albuquerque International Sunport.
Owl Springs Way Bridge Replacement Project
The previous Owl Springs Way bridge over the Jemez River was constructed in 1963. The 2019 structure inventory and Appraisal Report indicated that the bridge had a sufficiency rating of 49.99 out of 100 and was classified as “Structurally Deficient”. Over the last decade, the bridge was overtopped numerous times by Jemez River Floodwater, resulting in flooding and closure of the adjacent roadway. The previous bridge was structurally deficient and functionally obsolete and did not provide adequate freeboard to accommodate the river hydrology at peak flow.
I-40/Zuzax Interchange
Located in Tijeras Canyon just east of Albuquerque, NM a new bridge was constructed next to the existing bridge. The new bridge had MSE walls at the abutments with standard spread footers and a pier with a spread footer as well. This was a steel girder bridge over live traffic, so we had to underdeck the new bridge to protect the traveling public and existing highway. The Tijeras Arroyo ran to the south of the bridge and a new box culvert was placed in the new bridge location.
Rio Bravo Interchange
This interchange is a major gateway into Albuquerque’s South Valley and the Mesa del Sol community that serves approximately 50,000 vehicles per day, including heavy commuter and commercial truck traffic. When the project was initiated, the 45-year-old diamond interchange had significantly outlived its design life and had become increasingly congested and unsafe.
Catwalk Trail Reconstruction Design-Build
Numerous industry groups have recently awarded some of their most prestigious honors to the Catwalk Trail Design/Build Project.Awards received include:Associated General Contractors Alliant Build America Awards2017 Design-Build Civil AwardAssociated General...
NM 599 / County Road 62 Interchange
Owner/Engineer: NMDOT Location of Project: Santa Fe County, NM Final Contract Amount: $7,080,995 Completion Date: July 2013 Project Awards Received: 2013 NMDOT District Five Pavement Smoothness Quality Award 2013 American Concrete Institute New Mexico Chapter...
Exit 102 Acomita I-40 Interchange at MP 102.000
New Mexico Department of Transportation (Owner) Contract Amount: $3,851,057 (AUI Subcontracted portion) This project is one of the first bridge/interchange projects that utilized roundabouts at the on and off ramps. The newly constructed bridge over I-40 was built...
NMDOT CN 1495, BR-0377(1)01
New Mexico Department of Transportation Project Location: Luna County, NM Contract Amount: $1,336,431 This project called for the removal and replacement of a 192’ long bridge over the Mimbres River. The 8-span bridge was a slab bridge approximately 33’ wide. AUI...